Site became operational
Number of turbines
Installed generation capacity
MW

Tournafulla Wind Farm is located near Templeglantine in Co. Limerick.

The 27MW wind farm entered commercial operation between 2007 and 2008.

The 18-turbine wind farm comprises the 7.5MW, 5 turbine phase 1, which was commissioned in 2007, and a 19.5MW expansion which was commissioned a year later in 2008.

Tournafulla Wind Farm can power almost 18,000 homes^ and help abate almost 22,000 tonnes of harmful carbon dioxide* per annum.

West Limerick and North Kerry Community Fund

Through our Tournafulla, Rathcahill, Dromada, and Athea wind farms in West Limerick, and Lenamore Wind Farm in North Kerry we make almost €250,000 per year available for community projects.

Click here to find out more
Contact us

We are here to answer your queries.

Please get in contact with us using the details below and our team will respond to you within two working days.

Community Fund Development Officer: [email protected]

If your query relates to the operation of the wind farm, please contact:

Wind Farm Operating Team: [email protected]

^Total annual homes powered quoted based on installed capacity, typical onshore wind load factor of 32%, typical annual consumption (4,200kWh). * Quoted CO2 emissions abated based on typical annual MWh output and average CO2 Emissions in 2018 (0.291t/MWh) in the All-Island Single Electricity Market, and published by the CRU in its Fuel Mix Disclosure and CO2 Emissions for 2018, September 2019.