Dunneill

Dunneill Wind Farm is located near Dromorewest, Co. Sligo.

The 11MW wind farm comprises 13 turbines and entered commercial operation in 2010. Dunneill Wind Farm can power almost 7,500 homes and help abate around 9,000 tonnes of harmful carbon dioxide per annum.

Dunneill Wind Farm was granted planning permission in March 2004 to expire in 2024, a period of 20 years. However, the wind farm has only been in commercial operation since 2010, a period of 12 years. SSE Renewables are now seeking to extend the operational life of Dunneill Wind farm by a further 15 years up until 2039 in order to continue the provision of renewable energy and advance its contribution towards Ireland Climate Change commitments.

About Dunneill wind farm
OwnershipSSE Renewables
LocationCounty Sligo
MW capacity11.1
Number of turbines13
Year site became operational2010

Contact

We are here to answer your queries. Please get in contact with us using the details below, and our team will respond to you within two working days.

If your query relates to the operation of the wind farm, please contact:

^Total annual homes powered quoted based on installed capacity, typical onshore wind load factor of 32%, typical annual consumption (4,200kWh). * Quoted CO2 emissions abated based on typical annual MWh output and average CO2 Emissions in 2018 (0.291t/MWh) in the All-Island Single Electricity Market, and published by the CRU in its Fuel Mix Disclosure and CO2 Emissions for 2018, September 2019.

An extension of life planning application has been submitted to Sligo County Council this can be viewed via this link ePlan - Online Planning Details and the planning reference number is 22291